Case study
Ridgeline: the flagship mining fleet
EBM was built and validated on a 74-vehicle haul fleet — 74-vehicle mining fleet (flagship deployment).
48% fuel reduction (Ridgeline case study, projected)
77% emissions reduction (Ridgeline case study, projected)
The story
Background — the fleet, the engines, and the fuel bill at stake.
What EBM found — combustion deviations invisible to a scheduled-maintenance program.
The projected outcome — see the figures above ((Ridgeline case study, projected)).